Next-Generation Reservoir

Southwest · Feasibility

Next-Generation Reservoir

Managed storage and aquifer recharge engineered for drought cycles and 1-in-500 year flood events.

Key metrics

310,000 AF

Active storage

80,000 AF/yr

Recharge capacity

-35%

Evaporation control

1-in-500 yr

Flood design event

14

Communities served

2031

Target commissioning

Overview

Storage is designed around variability rather than averages: capture during extreme wet events, controlled recharge during drought.

Evaporation control and lined recharge basins protect yield in a high-heat basin.

Operations are forecast-driven, using seasonal hydrology models to schedule capture and release.

Partners

Basin authority · Federal reclamation agency · Tribal water partners

Delivery timeline

  1. 2025

    Hydrologic study

    Basin yield, recharge suitability, and climate scenarios.

  2. 2026

    Design

    Dam safety, spillway, and recharge basin engineering.

  3. 2027

    Federal & state review

    Multi-agency environmental and safety approvals.

  4. 2029

    Construction

    Embankment, outlet works, and conveyance.

  5. 2031

    First fill

    Staged fill and operations handover.