Southeast US · In design
A water-positive compute campus co-located with on-site generation and closed-loop thermal recovery.
1.2 GW
Planned capacity
Water-positive
Water balance target
98% recirculation
Closed-loop cooling
1,400 acres
Site footprint
3,500+
Construction jobs
2029
Target commissioning
The AI Campus is designed as a single integrated system: generation, water treatment, thermal recovery, and compute halls planned together rather than assembled after the fact.
Siting prioritizes basin resilience — the campus is engineered to return more treated water to its watershed than it withdraws across a full operating year.
Phased delivery allows early capacity to come online while later blocks scale with regional interconnection.
Regional utility · State water authority · Hyperscale anchor tenant
2025
Basin modeling, interconnection studies, land assembly.
2026
Environmental review, water rights, and utility agreements.
2027
Substation, treatment plant, and first compute block.
2028
First 300 MW online with closed-loop cooling in service.
2029
Remaining blocks commissioned; water-positive accounting verified.